Quality Inspection is highly important of the whole spring production flow. The effectiveness of inspection methods and results is crucial to ensure the quality of products. The quality inspection of the Zihuoli Spring mainly rely on the spring design and manufacturing system, Its core appeal is to try to replace manual operation with intelligent software and hardware, so as to avoid the failure and distortion of quality inspection that may be caused by personal. In addition, based on the mandatory control of processes, it ensures that unqualified semi-finished products will not flow into the next process. Here below are the characteristics and highlights of the quality inspection operation of Zihuoli Spring.


1.Spring Design- Data Source &Tolerance Control

Sometimes, the defective products of spring production may be caused by the understanding deviation of the production staff or quality inspection staff on the technical requirements. Begin with the inquiry, the spring is checked by experienced engineers, who fully understand the drawings and customer needs, and recheck the design of the spring. When there is deviation in the design, we will communicate with the customer in time. After confirmation, we will save the parameters and tolerance requirements that need to be controlled in the drawing in our database before the price evaluation for direct call by subsequent production and quality inspection staff. This will greatly reduce their professional requirements for identifying the technical parameters of the drawing. Our design module has locking functions to avoid artificial deletion and modification, and ensure the accuracy of the data and tolerance of the spring.


2. Production module – Stop the defective products flow into the next process

Zihuoli Spring design and manufacturing system will schedule each order and allocate the materials, equipment, personnel, processes and testing items involved in each process. The first inspection, patrol inspection, PKK or CPK control and other quality inspection control are set up from the main coiling, heating treatment, grinding and surface treatment. If the inspection of the current process is unqualified, the semi-finished products will not flow into the next process.


3.Full-automation Inspection

Most of spring measure equipment of Zihuoli Spring is fully automatic. Just input the parameters to be tested, and the testing machine can automatically run to complete the testing of the key characteristics of the spring, such as free height, spring rate and load of spring. The free height of spring, spring rate, load of spring, and other key parameters are detected, and the closed-loop full-automatic operation is realized from five aspects: parameter import, operation detection, data capture, quality judgment and output report, so as to eliminate the influence and interference of human factors on the test results to the greatest extent.


4.Material control, batch management, design linkage:

A large number of basic data such as chemical composition and tensile strength standards of spring wires of various brands are preset in the raw material management system of Zihuolli Spring. When our materials are warehoused, the chemical composition and tensile strength information on the material report will be entered into the system. The system will compare the data with the material standard, and if the standard is exceeded, the warehouse will be prompted to isolate automatically. Zihuoli Spring adopts batch number management for materials, and the batch number of materials is fine to each coil of wire. In this way, the whole batch number from spring wire to spring can be traced.